The Powder Springs Streetscape project begins at Sandtown Road and ends at South Marietta Pkwy. The project provide trail in-fill connecting the existing trail west of Sandtown Road to the Marietta Downtown area with a connection to the Mountain to River Trail (M2R) at Brown Park & Cemetery Trail. The project will replace existing sidewalk, install landscaped medians, install street lights, and replace traffic signals within the project limits.
The project is anticipated to begin in September 2021 and will be complete in late spring or early summer 2023.The Contractor for the project is CMES, Inc and the contacts for the project are as follows.
City of Marietta Project Phone Number - 770-794-5629
CMES Project Phone Number - 678-794-5200 (Jeff Harwood) or 770-982-1905 (CMES main office)
The complete project plans can be found at the link below.
Powder Springs Construction Plans.
The project requires a permit from the Georgia EPD as the total disturbed area is greater than 1 Acre. The erosion control plans can be found at the link below.
Powder Springs Erosion Control Plans.