Mechanical Permits

ONLINE PERMITTING IS HERE!

*We are no longer accepting faxed,
email, or paper copies of permits or 
plans for submittal*

  

CLICK HERE TO APPLY FOR PERMIT!  
 
 
 
ONLINE PLAN SUBMITTAL  
Please use the link below for more information and to learn how to submit your plans online. 
Our staff will be happy to assist you with any questions you may have regarding this new system.
Please contact our Permit Technicians or plan review staff for more information. 


**CLICK HERE!** 
 

 


********************************************************************************************
A mechanical permit is required for all work performed on heating, air conditioning, exhaust, ventilation and gas supply systems.

*Change-out, or replacement systems
installed are required to be inspected within 30 days of installation & operation.

Gas lines are also required to be permitted and inspected.  The corresponding utility provider will be emailed the results after the passing inspection.

LOAD CALCULATIONS
are required on all new equipment at the time permit is applied for. Please call inspector with any questions or for clarification.
*Please utilize the appropriate code books for methods of calculation,
 or utilize software programs available online.
  

 
Blower Door and Duct Blaster test are required on all new residential construction and must be posted at the panel box as part of your Mechanical Final inspection.